Engineering tools / Power backup

UPS runtime estimator

Estimate the energy budget for a battery-backed network system. Distinguish battery energy, inverter efficiency, output limits and real-world discharge curves.

Methodology and limitations

This first-order energy balance does not model lead-acid high-current discharge, lithium BMS cutoffs, inverter standby load, temperature or manufacturer-specific UPS runtime curves. Obtain an actual runtime graph and load test before relying on backup duration.